SPE PAPERS & INDUSTRY VALIDATION OF COMPLETIONS OPTIMIZATION SUCCESS
SPE Papers, Industry Presentations and Quotes from Customers Illustrate the Industry’s Response to Emerald Surf Solutions
OPTIMIZING FRAC PLUG MILL OUTS IN HORIZONTAL WELLS USING COILED TUBING
SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, 25-26 March, 2014
Why it’s important:
ESS helped them conclude that the consistent application of the optimization process reveals which key performance indicators have the greatest impact on performance which further improves consistency and predictability of the results
THERE IS MORE TO COMPLETIONS THAN JUST THE FRAC USING NEW TECHNOLOGY TO OPTIMIZE COIL TUBING DRILL OUTS
Eagle Ford Shale SPE Workshop
August 28, San Antonio Texas, USA 2013
Why it’s important:
The ESS optimization process starts by establishing key performance indicators and implementing tools and practices to track them on every well
Eagle Ford Shale SPE Workshop August 28, San Antonio Texas, USA 2013
IMPROVING POST-STIMULATION COILED-TUBING DRILL-OUT
SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition,
25-26 March, 2014
Why it’s important:
ESS applies scientific and engineering principles to understand the cause & effect of procedural changes enables quantitative data-driven decision trees to be implemented on each well
OPTIMIZATION OF SINGLE TRIP MILLING USING 2” COILED TUBING
SPE/ICoTA Coil Tubing and Well Intervention Conference & Exhibition, 22-23 March, 2016
Why it’s important:
ESS constructs meaningful and comprehensive operational-context data comparisons in the wells throughout the field, empowering maximum asset valuation and lowest cost operations to become systemic best practices
SPE 179090
IMPROVED CT WELL CLEANOUT AND MILLING PROCEDURES UTILIZING ONLY NON-VISCOUS CLEANOUT FLUIDS
SPE/ICoTA Coil Tubing and Well Intervention Conference & Exhibition, 22-23 March, 2016
Why it’s important:
ESS has the scientific tools and engineered solutions at the well-head to enable meaningful experimentation to be conducted on location that will feed real-time quantitative results back into the optimization cycle
SPE 179070
“I can’t imagine going back to the old way of mixing chemicals. Experienced technicians test the water and compatibility before ever starting the job. Fluid rate pump reporting is available with OpsViewer to spot and correct problems before they happen.”
- P.J. Edsall, Sr. Completions Engineer, 2016